By Categories:

Our projects

MPB, Liverpool

Full roof refurbishment

Roof Refurbishment

MPB, Liverpool

Introduction

Lowbridge Court — a residential block in Garston, Liverpool — had reached the end of the road with a failed flat roof membrane and a critically undersized drainage system. MPB appointed RML to deliver a full overlay using the Lancastria 20-year system, with a complete drainage redesign in the same visit. Project completed a full week ahead of schedule with a 20-year manufacturer-backed guarantee.

Client Name
MPB
Scope
Lancastria Overlay
Sector
Residential
Program
4 Weeks
Value
£134k
Access Method
Scaffold & Edge Protection
Operational Status
Fully operational

The Challange

Two problems in one roof. The existing membrane had failed and needed full remediation. But the bigger issue was drainage — outlets were too few, too
small and positioned too high to actually shed water. Add in core drilling through parapets, retained mansafe systems to test and certify, and residents continuing to live in the building below, and the brief was anything but straightforward.

The Solution

RML delivered a full Lancastria 20-year overlay across all main roof areas, upstands, parapets, penetrations, rooflights and roof hatches, with localised reinforcement and partial strip where the existing membrane was too far gone. The drainage was rebuilt from scratch: more outlets, bigger diameters, lowered levels and core-drilled through parapets with full making-good of masonry and pointing. Mansafe systems and ladder access retained, tested and certified. Working foreman on site at all times, Contracts Department overseeing programme, materials, waste and safety.

Scope Of Works

  • Lancastria Overlay Full 20-year overlay system across main roof, upstands, parapets, penetrations, rooflights and hatches.
  • Drainage Redesign Outlet numbers increased, diameters upsized and levels lowered for effective water discharge.
  • Core Drilling Parapets and upstands core-drilled with full making-good of masonry and pointing.
  • Mansafe & Access Existing mansafe systems and ladder access retained, tested and recertified.
  • Scaffold & CDM Exposed-eaves scaffolding throughout. All works to CDM 2015 with project-specific RAMS.
  • CDM-Compliant Delivery MEWP and scaffold access with full edge protection — site run with shop trading throughout.

What Our Client Said….

“We were delighted with the work carried out at Lowbridge Court. The completed works were finished to a high standard and the project documentation submitted was excellent. The efforts of everyone on site were clear to see — a fantastic job all round.”

MPB Management

Key Numbers

0k
Project Value £
0
Year System Warranty
0
Days Ahead of Programme
0
Meters of Upgraded Drainage

Project Images