Full roof refurb. Store never closed.
B&M’s Cheadle Heath store in Stockport needed its full 3,602m² roof brought back to a watertight condition — over a shop floor and garden centre that stayed open to the public throughout. RML refurbished the lot in a four-week programme, sequenced around trading hours. Roof sorted, not a single trading day lost.

Client Name
B&M
Scope
Roof Refurbishment
Sector
Retail
Program
4 Weeks
Value
£230K
Access Method
Scaffold & Edge Protection

The Challenge

The profiled metal roof at Cheadle Heath had reached the end of its coated life. Corrosion had taken hold at the sheet laps and around the fixings, earlier patch repairs and sealant were breaking down, and the rooflights had degraded to the point of clouding the shop floor below. B&M needed the full 3,602m² brought back to a watertight condition — with the store and the garden centre trading right through it.

The Solution

RML surveyed the whole roof first, then built the programme around the store’s trading hours rather than the other way round. Corroded laps were treated and failing fixings replaced, rooflights replaced and every penetration, flashing and detail re-dressed before the roof was primed and coated in phased bays — tracked against a marked-up roof plan so progress was visible bay by bay. Access-critical and disruptive work ran out of hours. Four weeks, 3,602m², store open every day.

Scope Of Works

  • Condition Survey Full survey across the 3,602m² roof to record corrosion, failed laps and rooflight condition before pricing the works.
  • Lap & Fixing Repairs Corroded sheet laps treated and sealed, degraded fixings replaced across the roof area.
  • Rooflight Replacement Aged and discoloured rooflights replaced to restore natural light into the store below.
  • Details & Penetrations Flashings, upstands and rooftop penetrations redressed and made watertight.
  • Prime & Coat Full roof primed and coated in phased bays, tracked against a marked-up roof plan through to completion.
  • Out of Hours Delivery Programme sequenced around trading so the store and garden centre stayed open to customers.

Key Numbers